Innovative solutions in the field of pre-fabricated structures.
+7 (495) 980-72-33

Deployment

Развертывание

All basic modules APL-500 structurally thought out for their easy transport and ensure their quick assembly and disassembly. Tent design provides for each section of the assembly. Tent elements docking technology allows for phased installation of each of the following sections, regardless of the previous one.

Under such conditions, it achieved the speed and ease of installation. Estimated time of installation APL-500 is 15 days.